Here, our scope was surface works and shallow utilities. This included site works, common excavation, preparation of sub-grade, granular sub-base and base course, construction of concrete curb and gutter, tack coat, hot mix asphalt pavement, and electric works.
The project cost was $850,000, completed within 3 months – one month ahead of schedule.