Norcope installed deep and shallow utilities for this project. The project scope included traffic control, trenching and backfilling, preparation of the sub-grade, installation of manholes, catch basins, the sanitary sewer and water system with the service connections, and the electrical work. The project cost was $1.5 million CAD, and Norcope completed this job within 4 months.